Victory at Mansfield
10,000 slab and beam foundation. 6,000 square feet of paving. 2,500 square feet of sidewalk and miscellaneous. Mansfield, TX 18,500 Sq Ft Foundation & Site Work
10,000 slab and beam foundation. 6,000 square feet of paving. 2,500 square feet of sidewalk and miscellaneous. Mansfield, TX 18,500 Sq Ft Foundation & Site Work
17,000 pier and beam foundation with formed beams and 36 belled piers. 63,000 square feet of paving. 3,000 square foot of colored stencil concrete sidewalk. 3,000 square feet of typical sidewalk. Forney, TX 86,000 Sq Ft Foundation & Site Work
55,000 square feet of foundations across 8 buildings. 80,000 square feet of paving. 2 approaches with large concrete headwalls and concrete dividers. Weatherford, TX 135,000 Sq Ft Foundations & Site Work
8,000 square foot asphalt demo and haul off, with installation of 8,000 square feet of tiered foundation. Double Oak, TX 8,000 Sq Ft Demo & Foundation
150,000 square foot multi-story building with 50,000 basement foundation and 2 slabs on deck. 16,000 square feet of paving. 6,000 square feet of sidewalk. 1,200 linear feet of 20 tapering foot walls with footing and 109 piers. Euless, TX 172,000 Sq Ft Foundation & Site Works
130,000 square foot split-level multi-story building with basement. 3 slabs on deck. 7,000 square feet of 12′ walls in basement. 66,000 square feet of paving including turn lane and strips of stamping color. 6,500 square feet of sidewalk. 450 linear feet of retaining wall footing, and 275 linear feet of screen wall footing. Sachse, TX…
11,500 square foot building with slab and beam foundation, 23,000 square feet of paving, 1,000 square foot versacourt pad. 8,000 square feet of sidewalk. 2,200 square feet of 6″ inverted pilot channel and miscellaneous work. Arlington, TX 32,000 Sq Ft Foundation & Site Work
113,000 of foundations across 6 buildings. 185,000 square feet of paving. 4,000 square feet of sidewalk. 4,000 square feet of flume. Balch Springs, TX 306,000 Sq Ft Foundation & Site Work
2,500 square foot slab with 24 helical piers, pier caps and formed beams. 30,000 square feet of paving. 1,600 square feet of sidewalk. All concrete poured in one day. Lewisville, TX 34,000 Sq Ft Pier & Beam